Dome Condominium
Dome Condominium in North Miami suffered extensive damage to the roof of its two buildings during Hurricane Wilma. Advanced was called in to perform emergency repairs and installed a temporary roof to keep the buildings’ damages to a minimum. Advanced returned in July of 2006 to perform a complete reroof of the condo’s two buildings.
Dome Condominium was fitted with over 27,000 square feet of a built-up and modified bitumen roof hybrid, which Project Manager Chris Felix thought would best suit the customer’s needs. Advanced also installed new penthouse doors and steel staircases, with the use of a hydro crane.
Construction Managers David Baytosh and Josh Melgar were key contacts, keeping Consultant Jack Milrad of Tecon International informed at all times. And the job went off without a hitch. Another job well done.