Plan Your Commercial Roof Replacement with Confidence

Unclear costs and timelines can make planning a commercial roof replacement or re-roof difficult. Use our calculator to explore costs and timelines. Advanced Roofing helps Florida property managers and owners build realistic capital budgets and move forward with confidence.

  • Estimated budget and labor needs
  • Construction and permitting timelines
  • Warranty and maintenance considerations

Request a Free Estimate

Complete the form, and our team will contact you to discuss your project and arrange a roof assessment.

1983Serving commercial buildings since
750+Team members across Florida
100%Employee-owned
7Florida locations

Overlooked Details Can Drive Up Costs and Delay Your Project

Early planning helps limit unexpected costs and delays. Assessing current roof conditions, confirming permit requirements, and coordinating work around tenants help you establish a clear scope, realistic budget, and construction schedule.

Hidden Deck and Insulation Damage

Hidden damage can increase tear-off costs. Roof surveys and core samples help identify potential issues early.

Code Requirements and Permitting

Missed requirements can cause revisions and delays. Confirm code, product approvals, and permit timelines early.

Occupied Building Challenges

Noise, access restrictions, and weather exposure can disrupt operations. Phased work and daily dry-in protection help reduce these risks.

Estimate Your Roof Replacement Budget and Timeline

The example is a 60,000 sq ft occupied building moving to a 60-mil TPO system with a full tear-off. Adjust the inputs to explore preliminary costs and timelines for your project.

Your building

sq ft
The 9th Edition of the Florida Building Code takes effect Dec 31, 2026.
Budget range
Construction time
Permit + design
Code edition
Your plan includes
    How these numbers are estimated
    • Installed cost per sq ft: TPO $9–13, PVC $11–15, SBS 2-ply $11–16, metal retrofit $16–24.
    • Second tear-off layer adds $1–2 per sq ft. HVHZ adds about 10%.
    • Building height adds about 8% at 3–6 stories and 18% at 7+ stories, and slows production 10–25%.
    • Tight sites add about 5% and urban sites about 10%; a lane or street closure adds about two weeks of permitting.
    • Production with tear-off: TPO 1,800, PVC 1,700, SBS 1,200, metal 1,000 sq ft per crew-day; two crews from 30,000 sq ft and three from 100,000.
    • The range adds 10–50% for Florida weather days, inspections and phasing.

    Send this plan with your request and we will turn it into a site-specific scope, schedule and price.

    Estimates are for planning purposes only. Actual costs and schedules depend on roof conditions, project scope, permitting, and site logistics.

    Crane lifting materials for a commercial re-roof by Advanced Roofing

    One Contractor for the Life of Your Roof

    From assessment and replacement to warranty support, repairs, and preventive maintenance, Advanced Roofing helps keep your roof performing throughout its service life.

    • Roof Assessment and Design

      Inspections and testing guide roof system selection and attachment design.

    • Permits and Approvals

      We coordinate permit documents, product approvals and required inspections.

    • Phased Tear-Off and Dry-In

      Planned work sections and daily dry-in protection help protect interiors.

    • In-House Crane Division

      Our cranes support material loading, debris removal and equipment lifts.

    • Rooftop Equipment Coordination

      We coordinate equipment details and flashing with mechanical contractors.

    • Closeout and Maintenance

      Final inspections, warranty and preventive maintenance support long-term performance.

    Our Roof Replacement Process

    We coordinate your project from the first inspection through installation and ongoing roof care.

    Assessment and Planning

    We inspect the roof conditions, define the scope, estimate costs, and establish a preliminary schedule.

    Design and Permitting

    Select the roofing system and coordinate engineering, product approvals, and permits.

    Tear-Off and Installation

    Remove the existing roof, repair the deck, and install the new system in phases, with daily dry-in protection.

    Closeout and Maintenance

    Coordinate required inspections, provide applicable warranty documents, and establish a preventive maintenance plan.

    Re-Roofing Experts for Occupied Buildings

    Learn how Advanced Roofing helps hospitals, schools, office buildings, and retail centers replace aging roofs while keeping daily operations running.

    Holy Cross Hospital

    Fort Lauderdale

    Holy Cross Hospital

    557 beds

    Aging coal-tar-pitch roofs replaced on a working hospital while patients and staff stayed in place.

    Orlando Premium Outlet Marketplace

    Orlando

    Orlando Premium Outlet Marketplace

    40 stores

    A 16-year-old modified bitumen roof at the end of its life replaced over an open shopping center.

    Miami International Commerce Center

    Doral

    Miami International Commerce Center

    3 office buildings

    Fully occupied offices re-roofed with 5 a.m. starts so the noisiest work finished before employees arrived.

    “We just completed a major commercial office re-roofing project (3 buildings)… We had very few tenant complaints, the job was finished ahead of schedule, and under budget.”

    Commercial office ownerGoogle review

    “Advanced Roofing re-roofed an occupied supermarket in our shopping center. Not only was everyone I dealt with professional and courteous, they also got the job done without any complaints from the tenant.”

    Shopping center ownerGoogle review

    “Advanced Roofing completed a full replacement of 120,000 sq ft of our association roof on time and on budget.”

    Condominium associationGoogle review

    Have questions?

    Talk to a commercial roofing expert.

    (800) 638-6869Request a Free Estimate

    How long does a commercial roof replacement take?

    Construction can take several months, depending on roof size, system, existing conditions, weather, and site access. Design, permitting, and material procurement require additional lead time.

    Can the building stay open during the work?

    Yes. Work is phased so each section is torn off and dried-in the same day, with crane picks and noisy work scheduled around tenants.

    Which code edition will my permit fall under?

    The Florida Building Code 9th Edition takes effect Dec 31, 2026; applications submitted on or after that date must comply with it. The building official confirms the edition for each permit.

    Should I restore instead of replacing?

    If the insulation is mostly dry and the deck is sound, restoration may cost far less. Our restore-or-replace check screens for that.

    How much does a commercial roof replacement cost?

    Large commercial roof replacements can range from several hundred thousand dollars to over $1 million, depending on roof size, system, existing conditions, and site logistics.

    Do you handle the permit and inspections?

    Yes. We prepare the permit package, product approvals and engineering, and schedule the inspections with the building department.

    Does building height or site access change the price?

    Yes. Taller buildings need larger cranes, longer hoisting and more safety equipment, and tight or urban sites can need compact staging, timed deliveries or a lane closure for crane picks. The planner above adjusts for both, and the site visit confirms them.

    Get a Free Project Estimate

    Complete the form, and our team will contact you to discuss your project and arrange a roof assessment.

    (800) 638-6869

    Headquarters
    1950 NW 22nd St., Fort Lauderdale, FL 33311
    Hours
    Mon – Fri: 8:00 am – 5:00 pm
    Offices
    Miami · Palm Beach · Fort Lauderdale · Tampa · Orlando · Fort Myers · Jacksonville
    License
    #CCC024413

    What happens next

    • We call you back. A project manager reviews your request and confirms the details
    • We visit the site. We look at the building, the roof or equipment, and access
    • You get a written proposal. Scope, schedule and price in writing, with no obligation