Featured Projects

Southeast Financial Center

southeast-financial-center-miami-re-roof-eye-candy

southeast-financial-center-miami-roof-replacement

Southeast Financial Center Roof Replacement

Overcoming Challenges Re-Roofing Florida’s Tallest Office Tower, Southeast Financial Center in Miami, Florida

By: Advanced Roofing Inc.

Southeast Financial Center is the tallest office tower in Florida and the second tallest building in Miami. Topping more than 765 feet, the 55-floor building was constructed in 1984 and is home to more than 79 businesses including the United States Postal Service, Goldman Sachs, and the Canadian Consulate.

In 2013, Advanced Roofing Inc. (ARI) was selected by Facility Engineering Associates, Southeast Financial Center’s roofing consultant, to re-roof the office...

Read More

Advanced Roofing Selected to Construct Florida’s Largest Privately Held Solar Carport

lockheed-marin-solar-carport-florida-advanced-roofing

Lockheed Martin Selects Advanced Roofing to Construct Florida’s Largest Privately Held Solar Energy Array

lockheed-marin-solar-carport-florida-advanced-roofing

Lockheed Martin contracted Advanced Roofing and Advanced Green Technologies to design and build a massive 2.25 megawatt solar carport at the global security and aerospace company’s Mission Systems and Training facility in Clearwater, Florida. The project will be the largest private, non-utility owned solar array in Florida and is expected to produce 3.33 million kilowatt hours of electricity per year.

The solar carport will cover 151, 400 square feet of the facility’s parking lot with 7,260 solar modules to provide shade for 534 cars. At completion, the project is expected to cut electricity purchases for the facility by up to 60 percent, according to Lockheed Martin’s estimates...

Read More

DePuy Synthes

depuy-synthes-roof-replacement

DePuy Synthes Manufacturing Facility Roof Replacement

DePuy Synthes Manufacturing Facility Roof Replacement Palm Beach Floridat

DePuy Synthes is part of the Johnson & Johnson Family of Companies. They offer the world’s most comprehensive portfolio of orthopedic and neurological products and services for joint reconstruction, trauma, spine, and sports medicine. These solutions enhance the quality of life for doctors and patients by allowing surgeons to perform complicated procedures with a high level of workmanship.

Built in the 1960s, DePuy Synthes manufacturing facility in Palm Beach Gardens, Florida was designed using a built-up coal tar pitch roof system secured to a Tectum deck. In 1998, the original roof was recovered using a cold tar pitch and gravel solution...

Read More

Cyril E. King Airport

st-thomas-airport-roof-replacement

Cyril E. King Airport – St.Thomas U.S.V.I – Roof Replacement

st-thomas-airport-roof-replacement

Cyril E. King Airport is a public airport located four miles east of Charlotte Amalie, the capital of St. Thomas and largest city in the United States Virgin Islands (USVI).

Built in November 1990, the Cyril E. King Airport’s roof had run its course over the last 23 years due to extreme weather conditions on the island. With leaks disrupting daily operations throughout the airport, the management team knew it was time to replace it.

In 2013, Advanced Roofing Inc. (ARI) teamed with St. Croix-based general contractor J. Benton Construction Inc. to tear-off and re-roof the Cyril E. King Airport...

Read More

Miami Lakes Research & Industrial Park

Miami Lakes Research & Industrial Park Roof Replacement

miami-lakes-roof-replacement

Project Description

The award winning roofing project was given in 2013 with a RoofPoint Certificate of Recognition for outstanding work in South Florida. The project features numerous energy and environmental innovations, including:

  • TPO roofing material reflects solar energy, is environmentally friendly and able to be recycled, and is resistant to UV and heat degradation
  • Energy Star compliant cool roof provides up to $97,000 in rebates from local utilities and reduces load on air conditioning systems
  • Extruded polystyrene roof insulation to increase overall energy efficiency
  • 20 year warranty

Abo...

Read More

Experimental Plane Crashes Into Florida Grocery Store

image002Publix Supermarket, DeLand, FL

Via MSNBC: Shoppers at a Florida supermarket shouted “Get Out! Get Out!” and “Publix is on fire!” when a small experimental plane crashed through the roof Monday evening, 911 audio reports released Tuesday show. Five people were injured with burns as fire shot through the roof and into the store. The plane was an amphibious experimental aircraft that took off from DeLand Municipal Airport and suffered engine failure.

Damage Assessment

Advanced Roofing was notified to be on standby to make emergency repairs as soon as the local fire department released the scene. What was soon discovered was that the plane had gone through the entirety of the roofing material, leaving a 40ft-by-45ft hole between the inside of the store and the outside.

The Response

Within 2 ho...

Read More

Federal Reserve Bank of Atlanta Miami Branch

Federal Reserve Bank of Atlanta Miami Branch Roof Replacement

federal reserve bank miami roof replacement

The Federal Reserve Bank of Atlanta is part of the central bank of the United States known as the Fed. The Fed provides cash to banks, savings and loans, and clears millions of checks every day.

Why did the Fed choose Advanced?

Advanced Roofing was selected as the most qualified roofing contractor, with over 28 years accomplishing the most unique and challenging projects in the South East United States. Our experience and commitment to quality enables us to bond $10 million for single projects and $70 million aggregate.

Advanced also maintains one of the highest safety standards in the industry. A full-time safety officer routinely visits and inspects the job site to ensure everything is beyond OSHA compliant...

Read More

Classic Residence by Hyatt

Classic Residence by Hyatt Roof Replacement

hyatt-clasic--roof-replacement

The Classic Residence by Hyatt in Aventura, Florida is not only an active retirement community, but it is also a specialized assisted living facility. This five year old property faced a major dilemma when the original waterproofing systems failed. Due to Advanced Roofing’s experience with waterproofing systems they were called in to install a new waterproofing system, not on the roof, but on the ground level. Advanced Roofing fixed the facility’s problem by installing a new Siplast two-ply torch waterproofing system at the terrace decks, entry driveway and plaza deck walkways, along with the associated Parapro flashings on the walls and flower beds.

An important aspect of this community is the on-site care center that required unobstructed ...

Read More

Jonathan’s Landing

Jonathan’s Landing Roof Replacement

jonathans-landing-club-house-roof-replacement

Jonathan’s Landing is an upscale private community located in Jupiter, Florida. Advanced Roofing was called upon to re-roof the golf club building, the Snack Shack, and the covered bridge which led to the golf club at the community’s golf course. A new flat roofing system was installed, as well as, new tile, and copper drip edge.

One the project’s biggest challenges was that the golf club was located on a small island. The only access to the island was via a narrow bridge, which made transport of equipment and materials very difficult. Therefore, equipment and materials were placed on one side of the building and the progression of the re-roof had to be done from one side to the other.

Along with re-roofing the entire building, the roofing crew ...

Read More

VA Medical Center Miami

VA Medical Center Miami Roof Replacement

va-medical-center-miami-roof-replacement

The Veterans Affairs Medical Center is an 803 square re-roof project in busy downtown Miami.  The project consisted of two phases.  The first phase, “Phase A”, was 163 squares of very difficult roof.  A GCI tower crane was needed full time for all construction processes from material loading to debris removal.  The GCI tower crane required a FAA permit due to the height of the building and its surroundings.  For “Phase A”, the crew, headed by Foreman Tony Jefferson, removed all existing roofing membrane and light weight concrete to the structural concrete deck. Then, a temporary roof in cold process adhesive and new ¼”-sloped light weight concrete and E.P.S. board was installed...

Read More